Manual · Engineering

Engineering record — internal detail. The manual is authoritative for product behaviour.

Engineering4 min read

Changelog

Every dated design and plan in the record, in order, with status.

ForEngineer

Timeline

DateWorkstreamTypeStatus
2026-07-21Inventory review fixesDesign + planShipped
2026-07-30Supabase → Neon migrationDesign + planHistorical — completed
2026-07-31WhatsApp hybrid gatewayDesign + planSuperseded by Telegram
2026-08-01Inventory security & tenancy reviewDesign + planShipped
2026-08-01Telegram integrationDesign + planLive — webhook operational
2026-08-06Operations & fleet security reviewDesign + planShipped
2026-08-11Port & warehouse modulesDesign + plan + tasksPhases 0–5 shipped, phase 6 in progress
2026-08-19Orders & invoices security reviewDesignShipped
2026-09-11Sidebar permissions & design unificationPlanShipped — verified
2026-09-17Module gaps & fixesPlanCurrent — execution in progress
2026-09-17Documentation manual sitePlanCurrent — this site

Earlier, undated material

Features/feature-01.md predates the migration and describes a Supabase and Stripe architecture: tenant trigger setup, a Drizzle introspection config, an auth funnel, a Stripe checkout action and an onboarding page. It is kept for history only and should not be used as an implementation reference.