Operating manual
Lane playbooksVerified 2026-11-1110 min read

Gross — job costing and cost variance

Estimate the job, record the service bills, link them to the job, and read margin and variance.

ForFinanceOperations
LaneGross forwarder

Estimate the job

Create the job with type FORWARDING and commercial model GROSS. Add REVENUE and COST estimate lines by category: carrier, port, customs, haulage, documentation. The estimate is the quotation; it never posts.

Record the job cost

  1. 01

    Enter the service bill

    Use a SERVICE line with a counter account (for example 5500 Subcontracted Transport or 5700 Port & Customs Charges). Link the job on the line or header.

    Procurement Hub → Bills → New Bill
  2. 02

    Approve the bill

    Approval posts the expense and AP, and the job link attributes the cost to the job.

  3. 03

    Pay the supplier

    Pay Bills clears AP. The job cost is already recognised at bill approval; payment does not change the job margin.

Read the variance

ReportWhat it showsWhat to investigate
Job ProfitabilityRevenue, direct cost, gross profit, marginRevenue with no cost, or cost with no revenue
Job Cost VarianceEstimated vs actual by category and carrierA category far above estimate
Unbilled Job AccrualRevenue and cost recognised before billing1350/2250 residuals

Rule

No COGS for a forwarder

A gross forwarding job must not create owned inventory or post COGS. If it does, the job was created as TRADING or the receipt used OWNED inventory.